10 acres in 10 days.

Our own crews, our own components, one schedule.

Installer crew assembling greenhouse frames

200

in-house installers

10 : 10

acres installed in days

1

point of responsibility

The ten-day build.

From bare ground to finished greenhouse in ten days. Here's how we do it.

  1. Days 1-2

    Site Prep

    Ground levelling, drainage, footings

  2. Days 3-4

    Frame

    Structural skeleton erected

  3. Days 5-6

    Envelope

    Panels and covering installed

  4. Days 7-8

    Systems

    Water, irrigation, controls

  5. Days 9-10

    Finish

    Racks, trays, final checks

One day, one acre.

  1. Day 1
  2. Day 2
  3. Day 3
  4. Day 4
  5. Day 5
  6. Day 6
  7. Day 7
  8. Day 8
  9. Day 9
  10. Day 10

Each square is one day and one acre at full crew capacity. Site schedules depend on ground preparation and access.

Finished greenhouses in rows

Why it is fast

One team from factory to site.

Components are made to fit in our factory, so crews assemble rather than adapt on site.

The same company makes and installs, so there is one point of responsibility.

Start a conversation.

Tell us your site, acreage and timeline. We will come back with a specification and quote.